Home About Us Products Jobs Contact Us

Loading...

Protective Products
Disposable Face Mask
FFP2/KN95 Face Mask
N95 Medical Face Mask
Kids Face Mask
Products We Make
ESD Gloves
ESD Mat
Sticky Mat
ESD Wrist-Heel Strap
ESD Garment
ESD Chairs
ESD Tapes
Earth Bonding Plug
Cleanroom Construction
E.P.A.
ESD Mat-Curtain
ESD Wrist Strap
Ground Lead Kit
ESD Heel Strap
ESD FieldService kit
ESD Dispenser
ESD Brushes
ESD Tweezers
ESD Corrugated Box
ESD Box-Tray
ESD Magazine Rack
ESD Cart-Pallet
ESD PVC Floor
ESD Packing
ESD Tapes-Dispenser
ESD Pliers Screw Drivers
Clean Room
Cleanroom Garment
Cleanroom ESD Fabric
Cleanroom Caps/Hoods
Cleanroom ESD Gloves
SMT Stencil Roll
Disposable Products
Cleanroom Wiper
Clean Room shoes Cleaner
ESD Finger Cots
Cleanroom Face Mask
Sticky Roller
Shoe Cover Dispenser
Cleanroom ESD Shoes
ESD Chair Accessory
Cleanroom Swab
Cleanroom Mop
Vaccum/ESD Hoover
Dehumidfying Cabinet
SMT Splice Tape/Tool
Cleanroom Sticky Mat
Ionizing Instruments
Ionizing Air Gun
ionzing Air Blower
Ionizing Air Nozzle
Ionizing Bar
Voltage Genetator
EliminationInstrumet
Simco Series
Soldering Station
Soldering Station
Desoldering Station
Soldering Pot
ESD vacuum pen
Smoke Absorber
Rework System
Soldering Irons
Magnifier
Hakko
Weller
Soldering Tips
Ultrasonic Cleaner
Lean Pipe Products
logistics Lean Pipe
ESD Work Bench
Ordinary Work Bench
Multiple Layers Work Bench
Bilateral Work Bench
Lighting Work Bench
Lean Pipe Storage Rack
Lean Pipe Production Line
Lean Pipe Joint
Lean Pipe Accessories
Roller Track Connector
Table Top
Caster Series
ESD Cart Trolley
Plastic Connector
Testers &Tools
Wrist Strap Tester
Wrist Strap monitor
Surface ResistTester
Static Field Tester
Hammer S.R tester
Strap Tester
Particle Counter
SMD Counter
Auto Screw Supplier
E-Screw Driver
Torque Tester
Auto Glue Dispenser
Hot Air/Glue Gun
Force Tester
Other Equipment
Cleanroom Project
Cleanroom Construction
ESD Floor Construction
Clean Booth
Cleanroom Bench
Cleanroom Filter
Cleanroom Air Shower
Cleanroom Equipment
Cleanroom Pass Window
ESD Gate System
 Products
 
  

   
Name:
ESD PVC Floor by Roll
Remark:
   
Product Decriptions:

Item Standard Test Value
Surface Resistance IEC1340-4-1/SJ/T11236-2001 10E6-10E9
Volume Resistance IEC1340-4-1/SJ/T11236-2001 10E6-10E9
Decay Time (5KV-500V) MIL-B-81705B/GJB2605-1996 <0.25s
Starting Voltage IEC1340-4-1/SJ/T11236-2001 <100V
Inflaming Retarding DIN4102/SJ/T11236-2001 <3s
Abrasion resistant JISA1453-19B/ST/T11236-2001 <0.01g/cm2
Density 1.55
Size(Packed by mat) Length 60cm*Width 60cm* Thickness 2mm,3mm
Size(Packed by roll) Length 20m*Width 1.5m,2m* Thickness 2mm,2.5mm

ESD PVC FLOOR INSTALLING INSTRUCTION

1. Precondition:

1.1 ESD PVC floor ground construction includes groundsill checking, ground touch

system installing, glue configuration, tile laying cleanout test and quality inspection of

tiles.

1.2 Temperature of construction surrounding should be 10~35;relative humidity

shouldn`t exceed 80%;construction place should be drafty. Basically,other projects of

the place should have been finished .

2. Material, equipment and tool

2.1 Material used for construction should conform to following requirements:

ESD PVC tiles: Physical capability and dimension should conform to requirements of

ESD PVC TILE GENERAL CRITERIONSJ/T11236, and its ESD function should be

permanent.Surface resistance should be 1.0x106—1.0x109.

Conductive Glue: should be of non-water-solubility, resistance should be less than

tiles, and sticking intensity should be more than 3x106 N/M2

Welding rod: surface color should be of equality, exterior diameter shoud be kept

consistent and material should be soft.

Copper foil: thickness shouldn`t be less than 0.025mm

2.2 Warehouse for placing tiles should be clean dry and drafty, perfect isolation from acid

alkali and other corrosive substances. When moving , load and discharge should be done

carefully against bouncing, and do not put tiles outside exposing to rain or sun.

2.3 Usual equipment for construction (tools inclusive) should includes notching machine,

welding torch, rubber hammer, knife, rule, brush, waxing machine and so on, all of which

capability and technique parameter should conform to technics requirement of

Construction.

3. Construction Preparation:

3.1 Reconnaissance of construction place

3.2 Make blue print for construction , drawings of ESD Ground Touch System Ground touch

port and Ground web chart.

3.3 All materials , equipments , tools should be well prepared

3.4 Demonstration should be done before formal construction when construction floor

exceeds 140 sqm.

3.5 Construction Scene should conform to following requirements:

When floor of roots is of cement or water mill:

1) Reminders on floor such as paint and bond should be scraped clean

2) Floor should be surely flat , fissure or any accidented must be flated.

3) Floor should be surely dry, moisture-proof should be done previously in case of low

hypsography

4) Floor surface should be rigid enough against loosen grits, and the intensity shouldn`t be

lower than NO. 75

When floor of roots is boards(wooden boards, ceramic tiles, plastics,e.g), original floor

should be of backout, and reminders on it should be cleaned quite.

Illumination device should configurated in construction scene.

3.6 Confirm position of ground touch port: port should be more than 1 pc in 100 sqm; 1-2 pcs

ports should be added when every 100sqm increased.

3.7 Floor should be cleaned quite before construction , and make sure no reminder such as

dust and dirt.

4. Construction:

4.1 Set datum line properly according to geometry frame of the room.

4.2 Copper foil should be laid as Ground Web Chart. Copper foils junction should be the

centre of every tile. Copper foil laid should be flat straight---no curl no gap. Copper foil

which contacts Ground Touch Port should be long enough .

4.3 Configuring conductive glue: fully mix glue with carbon powder by proportion 100:1

4.4 Glue brushing: glue should be brushed separately on the floor and copper foil laid, the

brushing should be full and consistent. Just let all this dry by airing when done.

4.5 Tiles laying: this should begain when floor brushed is dry and not sticky to hands. When

laying, both sides of tiles should be parallel to datum line and also action should be swift:

consistent gap of 1-2mm should be left between each tile; keep checking when laying ,

knock each tile with a rubber hammer to make sure it sticked strongly, and edges of floor

should be patched by tiles cutted properly.

4.6 When tiles laying comes to ground touch port, firstly lead out the copper foil which is due

to connect port, secondly connect it with the port strongly by welding or pressing, and

then go on laying.

4.7 When whole laying is finished, make notches along gap between two tiles with a notch

machine. Notch line should be straight flat and consistent, width shall be 3±0.2mm.

4.8 Start welding along the notch with a welding torch to connect tiles into a whole. And

redundants after welding should be scraped with a sharp knife, but should not hurt tile

surface.

4.9 Ground touch system process should includes conductive glue brushing, copper foil web

laying, copper foil laying for connecting ground touch port, ground touch port, earth wire,

grounding device.e.g.

4.10 When flooring construction is done, floor surface should be cleaned, and coated with

ESD wax for protection.

 

 



qq客服在线客服